Soakaway Repairs & Installation in Dorchester
For surface water that has nowhere to go — repairs to failed soakaways and new installations.
What is a soakaway and how does it work?
A soakaway is an underground chamber that takes rainwater from roofs and paving and lets it seep slowly into the surrounding ground, instead of sending it to a sewer.
Water arrives through a pipe, fills the open space inside the soakaway, and drains out through its sides and base at whatever rate the soil allows. The soakaway is a buffer: it holds a downpour that arrives in minutes while the ground absorbs it over hours.
Older soakaways are usually a pit filled with rubble or hardcore, with water held in the gaps between the stones. Modern ones use plastic crates, which hold far more water for their size, wrapped in a fabric membrane that lets water out and keeps soil from washing in.
How do I know if my soakaway has failed?
The clearest sign is standing water that forms faster and lingers longer with each spell of rain, until the ground over or near the soakaway barely drains at all.
Other signs:
- Gullies and downpipe shoes overflowing in heavy rain
- Downpipes backing up, or gutters overflowing with no blockage in them
- A patch of lawn that stays soft or sodden over the soakaway
- Damp at the base of a wall near a downpipe
- A soakaway that copes in summer but fails every winter
Because it happens slowly, people tend to describe it as the garden getting boggier each year rather than as something broken. If water is now pooling against the house walls or reaching airbricks, treat it as urgent: we take calls across Dorchester 24/7 on 0330 133 1625.
What causes a soakaway to fail?
Most soakaways fail because silt, leaves and fine soil wash in and fill the spaces that should hold water, until it has nowhere left to go.
Other causes are common too:
- No silt trap, or one that has never been emptied
- A missing or torn membrane, letting surrounding soil migrate in
- Roots growing into the pit and its inlet pipe
- Undersizing, especially where an extension or new paving now drains to an old soakaway
- Ground that drains poorly, or a water table that rises in wet months
- Compaction from vehicles or building work over the top
- A foul pipe wrongly connected to it, which clogs the soil with grease and solids
Rubble soakaways are the most likely to silt up over time, because they were rarely built with any protection.
Is it the soakaway or the pipe leading to it?
Waterlogging can come just as easily from a blocked or broken pipe on the way to the soakaway as from the soakaway itself, so the pipe is checked first.
A simple test helps. If a gully or downpipe backs up while the ground over the soakaway stays dry, the water is probably not reaching it, which points to the pipe. If the soakaway's inspection point is full to the top and slow to fall after rain, the soakaway is the problem. A camera along the inlet pipe settles it: we look for silt, roots, crushed sections or a run with no fall. Replacing a soakaway that was never the fault is an expensive way to find out, so we establish the cause first.
Can a blocked soakaway be repaired, or does it need replacing?
A soakaway blocked by silt in its inlet or silt trap can often be cleared; one whose fill and surrounding soil are choked throughout needs replacing.
Repair options include jetting the inlet pipe, emptying and cleaning a silt trap, cutting out roots and, on crate soakaways with access, jetting silt out of the crates. These restore capacity where the blockage is near the inlet and the ground around the soakaway still drains.
A rubble pit full of compacted silt cannot really be cleaned, since there is no way to wash the gaps out, and the soil face around it is often clogged too. At that point a new soakaway, often in a fresh position with a silt trap ahead of it, is the lasting fix. We tell you which applies before pricing either.
What is a percolation test?
A percolation test, or soakage test, measures how quickly water drains into the ground on your site, and it is the starting point for sizing any new soakaway.
The usual method follows BRE Digest 365. A trial pit is dug to roughly the depth the soakaway would sit, filled with water, and timed as the level falls between set points. It is filled and timed three times in quick succession, because the ground drains more slowly once it is wet, and the slowest result is used for design. The figure tells you whether a soakaway can work at all, and if so how big it must be. Without it, sizing is a guess, and undersized soakaways are one of the commonest failures.
How we install a new soakaway, step by step
We test the ground, size the soakaway to the area it drains, site it safely away from buildings, then build it with a silt trap and access for future maintenance.
- We agree the scope and a fixed price before starting.
- We carry out a soakage test where the soakaway would go.
- We measure the roof and paved area that will drain to it, and size it from that and the test result.
- We excavate, then install crates wrapped in membrane, or a rubble fill where that suits the site.
- We lay the inlet pipe with a proper fall and fit a silt trap ahead of the soakaway.
- We backfill, reinstate the surface as agreed and record the position.
You get a note of where the soakaway is and how big, so nobody has to guess in future.
Where can a soakaway go, and how far from the house?
Building Regulations guidance in Approved Document H says a soakaway should be at least 5 metres from a building, so the water it releases does not soften the ground under foundations.
It also needs to sit where the ground drains, which the soakage test confirms. It should not be placed uphill of the house where water could track back towards it, nor so close to other soakaways or drainage fields that they compete for the same ground. Avoid spots where trees will root into it or where vehicles will compact it. Too close to the building is one of the two failures we see most at installation, along with undersizing, and both are avoidable with planning.
Will a soakaway work in clay soil?
Often not well. Clay drains very slowly, so a soakaway in clay either has to be very large or will fill faster than it empties after heavy rain.
That is exactly what the soakage test is for: it shows whether the ground on your site can take the water, rather than relying on what the soil looks like. Where results are poor, the alternatives are attenuation, which stores the water in a tank and releases it slowly to a watercourse or sewer, or reducing how much water reaches the system through permeable paving, rain gardens or water butts. Connecting to a surface water sewer is the last option and needs the sewerage company's consent.
Soakaway rules: Building Regulations, planning and what can go in
A soakaway must take rainwater only, never foul water, and new rainwater drainage that forms part of building work has to meet Building Regulations Approved Document H.
Approved Document H sets an order of preference for rainwater: an adequate soakaway or other infiltration first, then a watercourse, and a sewer only where neither is reasonably practicable. So building control will usually expect a soakaway on a new extension if the ground allows one, backed by a soakage test. Repairing or replacing an existing soakaway on its own rarely needs planning permission. Paving more than five square metres of a front garden with a hard surface that drains onto the road does, unless the water goes to a permeable area or soakaway instead.
How much does a soakaway cost?
The cost of soakaway work depends on whether it needs clearing, rebuilding or installing new, how large it must be, and how much digging and reinstatement is involved. As a guide, clearing a blocked soakaway by jetting typically costs £150 to £300, repairing damaged pipework £300 to £600, and replacing a standard house soakaway completely £700 to £1,500. We agree a fixed price before work starts.
What drives the price:
- Repair or new installation, and whether a soakage test is needed first
- The roof and paved area draining to it, which sets the size
- Ground conditions and the depth of excavation
- Access for a digger and for taking spoil away
- The surface to be lifted and reinstated, such as lawn, gravel or block paving
- Whether the inlet pipe needs jetting, repair or a new silt trap
If the excavation turns up something unexpected, we pause, show you, and nothing extra is done until you have agreed it.
Who is responsible for a soakaway?
A soakaway and the pipes leading only to it are the responsibility of whoever owns the property it serves.
The 2011 transfer of shared sewers to the water companies covered pipes that connect to the public sewer. Soakaways do not, so a soakaway shared between neighbouring homes generally stayed private, and the owners share its upkeep. On some newer developments a communal soakaway belongs to a management company, which your deeds will say. Gullies in the road are the highway authority's, which for Dorchester is Dorset Council. In rented homes, a failed soakaway is normally the landlord's to put right.
Looking after a soakaway
A soakaway lasts longest when silt and leaves are stopped before they reach it, so most of the maintenance happens upstream at the gutters, gullies and silt trap.
Safe things you can do:
- Clear gutters and gully grids, especially after leaf fall.
- Lift the silt trap cover once a year and scoop out what has settled.
- Keep cars and skips off the ground above the soakaway.
- Wash patios and cars where the dirty water will not run into a gully that feeds it.
- Do not connect a new downpipe or paved area to it without checking it has the capacity.
Do not dig down into an old soakaway to look. Rubble pits can collapse, and crates can be damaged by a spade.
Covering Dorchester & the local area
We provide soakaways throughout Charminster, Martinstown, Crossways, Puddletown, Broadmayne, Poundbury and the surrounding area. Call 0330 133 1625 for a free, no-obligation quote.
How it works
Simple, transparent process
- 1
Tell us what’s happening
Call and describe what you’re seeing — a slow sink, a gurgle, a smell or standing water. It usually tells us a lot before we arrive.
- 2
We find the cause
We clear enough to get flow back, then work out why it blocked — because a drain that blocks twice has a reason.
- 3
A price before the work
If it needs more than a clear — a repair, a lining, a survey — you get the price and the reason before we start it.
- 4
You see the evidence
Where we survey, you get the footage. Where we repair, you see the before and after.